The city came out and looked over plumbing and did a pre-view of our concrete. We were approved and that is a good thing. The pour was planned to begin at 11, but that was delayed to 1:00 p.m. and then that was delayed to about 3:45.

The good news is we did finally get concrete delivered just as the rain came, but they still did the pour and that is a wonderful thing. We also have one giant mess at the house, but I’m not complaining about that so much I’m very thankful that it got poured and now I need for the rest of the Houston area to get the rain and not us until we get he slab poured. A huge thanks goes out to David for going back and forth to the house to be there for the pour.

David had to show that the hole was deep enough

David had to show that the hole was deep enough

and the mess begins

and the mess begins

NICE!

NICE!

all of these had to go in the holes

all of these had to go in the holes

work in progress

work in progress

what a great MESS

what a great MESS

more mess, but it is good

more mess, but it is good

David worked more on the sheetrock in the den, he removed the mantel above the fireplace and the sheetrock. It sure looks different in there!

more sheetrock gone

more sheetrock gone

I am truly blessed; I hope you are blessed by your daily threads. Love and hugs,
Ronda

About ronda926

I enjoy piecing quilts and getting to know people, as well as sharing the information I have on sewing. I love the sense of accomplishment once I'm finished.
This entry was posted in Home remodel, Pieceful Stitches and tagged . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s